| Neilcott Ltd |
|
 |
Rota
(Design & Build)
|
|
|
 |
| £140,000 |
|
|
|
 |
 |
 |
Thomas More School |
Rota designed and installed the mechanical services for this sports hall which was being built next to the existing swimming pool which will utilise the changing facilities within the new construction.
The installation consists of a gas fired radiant heating system within the main hall with ventilation water and heating within the new changing facilities. A new gas supply has been installed from the existing meter area within the main building to over 250 metres away in the sports hall plantroom.
|
|
|
For more information contact Nick Graves on 0208 974 2324 or email
|
|
|